Skip to main content

3. Research for Service Analysis: Large Projects HF Integration When Proposing Large Acquisition Project 3-8

Item # 6.1.1  Have human factors requirements, plans, analyses, and verifications been determined and documented for the product in accordance with the FAA Human Factors Acquisition Job Aid, FAA Human Factors Design Standard (HF-STD-001B), Human Factors Engineering Requirements (HF-STD-004A), FED-STD-795, Uniform Federal Accessibility Standards (UFAS), and other appropriate standards and conventions?

6.1.2  Have usability issues and human factors risks for all user (e.g., operators, maintainers, supervisors, administrators) populations been addressed for all intended sites?

Item # 6.1.3  Have the human-system performance studies and analyses (such as those related to workload, training, functional design, computer-human interface, staffing, safety and health, special skills and tools, work space, automation functions/roles, displays and controls, information requirements, display presentation, visual/aural alerts, input/output devices, communications, procedures, anthropometrics, documentation, and environment) been conducted to identify, document, and resolve/mitigate human factors issues?

Item # 6.1.6  Have steps been taken to identify, eliminate, reduce, or mitigate the sources of human error with the highest risks (combination of likelihood, severity, detection, and recovery)?

See additional HF criteria in Items 6.1.4, 6.1.5, 6.3.1, 8.4.2 and 8.6.10 of the ISR Checklist.